Just announced

The solar rebate
just got bigger for business.

Shops & Offices Small systems still covered
Farms & Depots Mid-size systems covered
Factories & Sites Now the big systems qualify too

The solar rebate cap is lifting from 100kW to 1MW — the size range most commercial roofs actually sit in. Worth checking, whatever your size.

The change is set to take effect 1 October 2026 and is not in place yet. Incentives depend on eligibility, system size, installation date and location.

Commercial-capable installers only Site-specific quotes, not estimates Your data stays in Australia No cost to your business
In plain english

What changed, without the press release.

Australia has around 22GW of solar on houses and a fraction of that on commercial roofs. This change is aimed squarely at the gap.

Before
100kW

The old rebate ceiling. Above it, a project dropped into a slower, more paperwork-heavy pathway with worse economics for a mid-size roof.

From 1 October 2026
1MW

Ten times the headroom. A warehouse, cold store, packing shed or factory roof can now be sized to the load instead of to a policy ceiling.

What it means
Your roof sets the limit

For most sites the ceiling is now available roof area, structure and your network connection — not a number written into a rulebook.

The honest caveat — and why it's an argument for moving now

The change is set to start on 1 October 2026. It is not in effect yet, and we won't pretend otherwise. What is certain is that a commercial system takes weeks to scope: a site visit, a roof and switchboard assessment, usage data, a network application. Businesses that start the quoting process now are ready when the door opens. Businesses that wait until October start from zero.

Free · No obligation · Two minutes

The overhead nobody audits

You negotiate rent. You review wages. Then there's power.

Electricity is one of the few large line items most operators treat as a fixed fact of life. It isn't — it's the one you can put an asset against.

A bill is rent. A system is an asset.

Every quarter you pay the grid, that money is gone and you own nothing. The same money directed at a system on your own roof buys a piece of plant that keeps producing for two decades and shows up on the balance sheet.

Commercial tariffs aren't just a rate — they're a structure.

Demand charges, time-of-use windows, capacity charges and export limits all shape what solar is worth on your specific site. Two businesses with identical bills can have completely different answers.

Daytime load is the whole game.

If your operation runs when the sun is up — retail hours, refrigeration, machining, irrigation, pumps, packing — you're the best-case scenario for commercial solar, because you consume what you generate instead of exporting it cheaply.

Illustration only

Twenty years of the same decision

A worked example, not a quote: what two decades look like for a site paying roughly $2,500 a quarter, if nothing changes versus generating a share of your own power.

Buy every kilowatt hour from the gridHighest
Generate your daytime load on siteLower
Years 11–20, system long since paid forLowest
The asset
You own the plant

A bill buys you nothing. A system sits on your balance sheet.

The long tail
It keeps generating

Panels are built for decades. That's when the gap really opens.

Illustrative only, to show the shape of the two paths. Not a quote, a projection or a guarantee of savings. Real figures depend on your tariff, usage profile, roof, network and system size — which is exactly what a site-specific quote establishes.

Compare properly

A commercial quote is not a bigger residential quote.

Here's what separates a real one from a number on a letterhead — and what you should be lining up against each other.

Your actual load profile, not an average

A serious quote is built off interval data or at least a full year of bills. If nobody asked for your usage data, they've guessed — and you'll find out in year two.

Demand charges addressed explicitly

On many commercial tariffs, peak demand is a large slice of the bill. Solar may or may not touch it. A quote that only talks about kWh is telling you half the story.

Network approval and export limits

Your distributor decides how much you can export, and sometimes how much you can install. A quote that hasn't factored in the connection application is a quote with a hole in it.

Roof condition, access and structure

Sheet metal age, purlin spacing, asbestos, penetrations, fall arrest, roof warranties. On a commercial roof this is a real engineering line item — not an afterthought.

A timeline you can hold them to

Site visit, design, network application, install, inspection, switch-on. A quote with no dates in it is a wish. Ask when each step happens and who owns it.

Who's accountable in year seven

Monitoring, O&M, response times, and whether the entity signing the warranty is the one doing the work. Commercial assets need a maintenance answer, not just an install date.

How it works

Two minutes now. No sales pitch attached.

1

Tell us about the site

Site type, address, roughly what you spend on power each quarter, whether you own or lease, and your timeline.

2

We screen for commercial capability

Plenty of installers do houses. Fewer do a 400kW warehouse properly. Only ones that do — and that cover your postcode — see your enquiry.

3

Compare quotes on paper

Same scope, same site, line by line. Take it to your accountant. Or take none of them.

Attach a bill and the quotes get sharper

At the end you can upload a recent electricity bill and a photo of the main switchboard. Optional — but a commercial bill shows your tariff structure and demand charges, and the switchboard shows available capacity. It's the difference between a real number and a guess.

Questions

What business owners ask us first.

Is the 1MW change actually locked in?

It's set to apply from 1 October 2026 and it is not in place yet. Until it starts, nothing is guaranteed — and we'd rather say that than pretend otherwise.

The practical point is that a commercial system takes weeks to scope and quote. Getting the site assessed now means you're positioned either way, and you'll know today what your current options are under the existing rules.

My site is small — is this still relevant?

Yes. Systems under 100kW were always covered and still are. The change adds headroom at the top; it doesn't remove anything at the bottom. A shop, café, clinic or small office is a completely normal commercial job.

We lease the building. Dead end?

No, but it changes the conversation. What matters is how much of the lease is left, whether the landlord will consent, and whether the structure is a direct purchase, a landlord-funded install with a rent adjustment, or a power purchase arrangement. Tell us the lease situation in the form and the installers can quote to it.

How much of our bill could solar actually cover?

It depends entirely on your tariff, your daytime load and how much roof you have. A site that runs machinery from 7am to 5pm is a very different proposition to one that runs overnight. Anyone who gives you a percentage before seeing your bill is guessing — which is precisely why we push you to attach one, so the number you get is calculated rather than claimed.

How big a system can we actually fit?

Usually it's the roof and the network connection that set the ceiling, not the policy. Available roof area, orientation, structural capacity, shading and your distributor's export limit all bind before the certificate cap does. An installer will model this properly from your address and roof plan.

What does it cost us to use this?

Nothing. There's no fee to your business at any point. Installers pay us when we send them a genuine, well-matched commercial enquiry. If we sent them junk, they'd stop paying — which is why we screen enquiries rather than forward everything.

Do you install, or are you reselling us to someone?

We don't install and we don't own an installer. We're a comparison service, so we have no particular system to push. The installers you hear from quote you directly and you contract with them, not with us.

We have multiple sites. Can you handle that?

Yes. Start with the largest or highest-consumption site so the installers have something concrete to work from, and note the others when you submit. Multi-site rollouts are usually scoped one representative site first, then replicated.

How long does a commercial install actually take?

From first site visit to switch-on, most jobs run several weeks to a few months. The design and install are rarely the slow part — the network connection application usually is, and it's outside your installer's control. That's the main reason to start scoping early rather than waiting.

Find out what your site qualifies for — before 1 October, not after.

Two minutes to tell us about the site. Commercial-capable installers do the rest. Quotes you can hold against each other, no obligation to proceed.

No cost to your business No obligation Accredited installers Two minutes